Building Official

Departments

Related
Pages

Building Official

BUILDING OFFICIAL:  William L. Moore
Email: 
Wmoore@littlecomptonri.org

Building Inspector and Zoning Official
: Peter A. Medeiros 
Email: Pmedeiros@littlecomptonri.org

Mechanical and Plumbing Inspector:
Edward Bucher
Phone: 
401-641-4524

Electrical Inspector: 
David Venancio
Phone: 
401-265-8918

Office Telephone: 
(401) 635–8384
Fax: (401) 635–2470


Office Hours for Building Inspector: 
are anticipated to be generally from 7 AM to 4 PM, Monday through Thursday
Contractors needing to speak with the Building Inspector or to schedule an inspection should leave a message on the office phone.  Phone messages are retrieved remotely on a regular basis.


                                           As of February 21, 2018 all permit applications will be taken in electronic format only.

To access the e-permitting program contractors or homeowners may go online to littlecomptonri.viewpointcloud.com or use the public computer that is provided in the Little Compton Town Treasurer/Tax Collector's office at the Town Hall. Any questions about the program may be directed to the Building Inspector.



Town of Little Compton, R.I.

Office of the Building Inspector

REQUIRED BUILDING INSPECTIONS

The following inspections are to be performed by the Building Inspector for your project. Please call 401 – 635 - 8384 to schedule Building Inspections. Twenty four hour notice is required for scheduling, please have job address and permit number available. Inspections are typically done Monday through Thursday.

Bottom Inspection BEFORE installation of stone
Footings and Pier holes BEFORE CONCRETE IS PLACED
Wall Forms BEFORE CONCRETE IS PLACED
Damp proofing BEORE BACKFILL
Trench (electrical/plumbing) inspection & under floor inspection BEFORE COVERING
Basement slab (vapor retarder) BEFORE CONCRETE IS PLACED
Structural / Framing BEFORE ELECTRICAL / MECHANICAL BEGINS
Insulation AFTER ELECTRICAL / PLUMBING INSPECTION, BEFORE WALL COVERING
Chimney Construction (When at smoke chamber)
Final Mechanical, Electrical, and Fire Department inspections
Certificate of Occupancy, as per section 23-27.3-120.1 of the 2019 Rhode Island Building Code, at completion of project, including, but not limited to, all inspections mentioned above, as well as, Final Grading and Soil and Erosion Plan compliance (if applicable),  a D.E.M Certificate of Conformance for septic systems, and completion of all C.R.M.C. requirements (if applicable).


SCHEDULE I BUILDING PERMIT FEES


PERMIT REQUIREMENTS 
NEW DWELLING AND ADDTIONS OVER 600 SQUARE FEET  
THE FOLLOWING SUBMITTALS MUST BE UPLOADED TO PERMIT APPLICATION
•     WELL WATER ANALYSIS
•    OWTS PRMIT FROM RIDEM
•    STORM WATER MITIGATION PLAN
•    COMPLETE SET OF SITE PLANS  
(INCLUDING SETBACKS, LOT COVERAGE, WETLAND, AND FLOOD ZONE INFORMATION), AND STRUCTURAL PLANS
•    APPROVAL FROM ANY OTHER APPICABLE STATE AGENCIES
•    APPROVAL FROM ANY NEIGHBORHOOD ASSOCIATIONS (IF APPLICABLE)


REQUIRED SUBMITTALS FOR A CERTIFICATE OF OCCUPANCY  

•    Certificate of Occupancy, as per section 23-27.3-120.1 of the 2019 Rhode Island Building Code, at completion of project, including, but not limited to, all completed inspections, as well as, Final Grading and Soil and Erosion Plan compliance (if applicable),  a D.E.M Certificate of Conformance for septic systems, and completion of all C.R.M.C. requirements (if applicable).
•    WELL WATER ANALYSIS (TAKEN FROM AN UNFILTERED FAUCET)
•    A BLOWER DOOR TEST
•    INSULATION CERTIFICATE



Town Hall
40 Commons; P.O. Box 226
Little Compton, RI 02837

© 2019 Town of Little Compton, RI 40 Commons, PO Box 226, Little Compton, RI 02837               

Powered By Revize Login